Subdivision involves turning one land into two or more lots. In Perth, it is now an important way for property owners to access equity and help infill housing while adding long-term value. An increasing number of homeowners are considering land subdivision Perth to meet demand for well-located housing. This guide will take you through everything you need to know about land subdivision in Perth.
In Western Australia, property subdivisions fall into a few key categories. Understanding these helps owners choose the right approach based on access, infrastructure, and long-term plans.
Each lot has its own title, utilities and access to the street. This is the best subdivision Perth for independence and resale flexibility, where people want a stand-alone block. It can cost more if services are duplicated, but it is unambiguous in its ownership benefits.
These lots are identified by surveyed boundaries rather than buildings, and shared driveways or access legs may exist. It may or may not include existing buildings. WAPC approval is necessary with individual titles for each owner. The process of survey strata subdivision Perth is commonly used on smaller infill sites and can be more affordable than a green title.
This type of subdividing lands applies when an existing building or complex is divided into multiple strata lots, usually for units or apartments. Ownership shares are based on unit entitlement, and boundaries follow building structures. It’s common in established developments where physical separation already exists.
A battle-axe subdivision Perth results in a rear lot situated behind an already existing front house, and is accessed via an elongated driveway or “handle.” This is typical of big blocks of land in older suburbs. Although inexpensive in terms of yield maximisation, it is subject to minimum access width and size requirements, along with service connections and driveway pavings.
All residential developments in Perth are ultimately ruled by the Residential Design Codes (R-Codes) that define minimum and average lot sizes for each zoning category. The R-Code for your block, such as an R20, R30 or R40, etc., dictates the number of lots you can create and if a particular subdivision type is viable. Local councils apply them through their planning schemes, so always check your site’s R-codes subdivision Perth before you start.
This process to subdivide and build in Perth is used for larger schemes such as estates or multi-staged developments. It is managed under the Community Titles Act, and these are also handled through the WAPC.
An established system of planning regulates the approval of subdivisions in WA for commercial or residential construction Perth. The decision maker is the WAPC, which deals with applications recommended by local governments and service authorities such as Western Power and Water Corporation.
The WAPC typically takes about 90 days to make a decision, giving councils and service providers an opportunity to scrutinise and comment. Simple applications might wrap up more quickly, while complicated sites that require additional reports or clearances can take longer. Keeping in touch with your surveyor or planner keeps the land subdivision process from slipping through the cracks.
Conditional approvals generally last for three years for subdivisions of up to five lots, and four years for larger ones. Owners must meet all conditions before expiry to avoid reapplication for residential or commercial construction Perth.
Before embarking on the process, it’s crucial to understand how to subdivide a block in Perth across different stages:
Begin by confirming your zoning and R-Code under the local planning scheme. Check for additional policies that might apply to new property developments in Perth, such as heritage overlays or flood constraints.
Assess the property for possible issues, including bushfire-prone status, acid sulfate soils, easements, or heritage listings.
Engage a licensed surveyor or town planner to conduct a yield study and check available services. Many Perth builders and planning consultants recommend feasibility as the first step to avoid unexpected costs.
Choose your subdivision type based on site access and servicing arrangements. Prepare architecture plans for council, service notes, and supporting reports (for example, a BAL report if in a bushfire-prone area). Accurate documentation can significantly streamline approvals.
Submit Form 1A with the required fees and subdivision plans to the WAPC. Your application will automatically be referred to relevant authorities, including local council requests management.
The WAPC circulates the proposal for feedback. Conditions typically align with the Model Subdivision Conditions, covering matters such as access, drainage, service provision, and demolition.
Typical conditions include providing separate utility connections, forming driveways, and installing crossovers.
Once conditions are issued, you’ll need to complete the required civil or servicing works. These may include sewer junctions, power domes, drainage, fencing, or crossovers. Obtain written quotes and keep track of completion certificates.
After all works are done, collect clearance letters from each authority and submit Form 1C for WAPC endorsement. Once approved, the plan proceeds to Landgate, where new titles are officially issued.
The Residential Design Codes (R-Codes) determine how small a lot can be and the design standards for dwellings. Knowing your property’s R-Code is vital before committing to property subdivision Perth.
R-Codes guide minimum and average lot areas, building setbacks, and open-space requirements. They apply to single, grouped, and multiple dwellings. Each local council assigns an R-Code to properties under its local preliminary planning assessment scheme.
Common density codes in Perth include R20, R30, and R40, which dictate how many lots you can create.
For instance, R20 generally requires an average of 450m² per dwelling, R30 around 300m², and R40 roughly 220m².
These figures determine the lot yield and are set out in Table 1 of the R-Codes Volume 1. Councils often provide easy-to-read summaries online, but always verify against the latest version.
WAPC’s Operational Policy 2.2 allows limited flexibility, such as a 5% lot-size reduction or corner-lot concessions under specific conditions. However, battle-axe lots cannot claim size reductions.
To make zoning and lot size requirements easier to understand, here’s a quick reference snapshot comparing common R-Codes used across Perth.
| R-Code | Minimum Lot Size (m²) | Average Lot Size (m²) | Minimum Frontage (m) |
| R20 | 350 | 450 | 10 |
| R30 | 260 | 300 | 10 |
| R40 | 180 | 220 | 10 |
Subdivision costs vary by location, site conditions, and type of title. Here’s how expenses typically break down.
Expect professional fees for a land surveyor for subdivision, town planners, and engineers, as well as WAPC application and endorsement fees.
WAPC fees depend on the number of lots being created and are updated regularly. Plan endorsement and Landgate title fees also apply. Survey costs can start around $4,000–$6,000, with planning and legal support adding extra costs depending on complexity.
Servicing is often the biggest cost.
You may need to pay for Water Corporation headworks, Western Power green dome connections, and sewer junction cut-ins. Other costs to subdivide land include driveway crossovers, fencing, retaining walls, and demolition, where existing structures are removed.
Indicative guides in Perth show that full servicing for a two-lot subdivision can range from $50,000–$90,000, depending on terrain and infrastructure access.
Additional costs for subdivision homes may arise from acid sulfate soil assessments, stormwater upgrades, tree removals, or asbestos clearance.
Always include a 10–15% contingency for unforeseen works.
The subdivision costs in Perth can vary widely depending on site conditions, zoning, and utility access. The table below provides indicative cost ranges Perth property owners typically encounter during the process.
| Item | Indicative Range (AUD) | When/How It Varies |
| WAPC Application Fee | $3,000–$5,000 | Based on number of lots |
| Licensed Surveyor | $4,000–$6,000 | Larger sites cost more |
| Water Corp Headworks | $7,000–$15,000 | Varies by connection type |
| Western Power Connection | $3,000–$10,000 | Depends on distance and dome relocation |
| Sewer Junction/Drainage | $5,000–$12,000 | Site depth and soil condition |
| Crossover & Fencing | $3,000–$8,000 | Material and slope influence |
| Demolition/Retaining | $10,000–$25,000 | Older or sloping sites cost more |
A standard subdivision in Perth takes around 12 to 18 months from feasibility to new titles. The WAPC assessment period is about 90 days, after which owners have three to four years to complete conditions. Once clearances are issued and Form 1C is lodged, Landgate typically processes titles within a few weeks. Appointing reputable subdivision certification services can speed up the process.
Subdivision success often depends on addressing hidden compliance factors for development approval Perth early.
Ignoring these factors can delay approvals and inflate budgets.
Understanding how zoning translates into real examples can help owners picture what’s feasible.
A 900m² corner block, which is zoned R20, has the potential to have two lots (average size of 450m²). Corner blocks tend to be eligible for better access and frontage compliance, which makes driveways and services less complicated. Conditions could involve an independent sewer connection, new fencing and crossover construction. A minor change to lot size might be approved under WAPC OP 2.2 if all design criteria are met.
A standard 870sq m R30 lot will usually return three lots of around 290sq m each. Survey-strata is quite frequently the more pragmatic title here, where services share access over a common driveway. Parking and open space criteria in accordance with R-Code must be satisfied. Utilities, like sewer extensions or Western Power upgrades, are also a feature of these developments.
Here are some of these insights contributed by leading subdivision experts based in Perth:
To subdivide houses smartly in Perth, confirm your R-Code and local planning policies, order a feasibility study, and shortlist your subdivision type. Obtain three quotes for civil works, map your approvals timeline, and track each condition to ensure you meet deadlines. With proper due diligence, expert guidance, and realistic budgeting, subdivision can be a highly rewarding way to grow property value in Perth.
The number of lots depends on your property’s R-Code, which sets minimum and average lot sizes. Other design factors like access, shape, and local planning policies can also influence the final yield.
Usually, yes, because survey-strata subdivisions share some services, reducing connection costs. However, total expenses still vary depending on access arrangements and utility authority requirements.
Allow several months for assessment, servicing, and clearances before titles are issued. The WAPC’s 90-day decision target is followed by time for works, endorsements, and Landgate processing.
You’ll need a Bushfire Attack Level (BAL) assessment to determine risk and construction standards. This may add extra design and building requirements to ensure safety compliance.