Duplex and triplex development is becoming the choice for many Australians as they offer functional density, multi-income opportunities and multiple living arrangements for families in today’s modern era. Homeowners and small developers are increasingly turning to such configurations to maximise land value and accommodate multigenerational living without embarking on large subdivisions.
The year 2026 is poised to be significant as new building codes, regulatory changes and stabilising material markets are changing the feasibility equation. Supply chains are also getting better, and some states, such as Western Australia, are providing clearer planning pathways. To help you plan, this guide will show you national and Perth build costs, upcoming changes, incentives, WA R-Codes and trends.
Building costs in 2026 will be less of a roller coaster than we saw earlier in the decade. Materials prices are settling in some areas, but labour availability is still pushing up tender prices. The triplex and duplex construction costs will increase for builders, but not dramatically.
The price trajectory will be determined by a combination of factors such as labour availability and new energy efficiency requirements. The industry expects more stable pricing, although escalation allowances are still crucial in planning.
Australia’s construction market continues to settle after several years of volatility. National averages provide a useful starting point for duplex and triplex feasibility, especially for early budgeting. The following breakdown separates triplex and duplex development costs clearly, so each type can be assessed accurately.

These costs represent the construction-only pricing of double-storey homes across Australia.
| Specification Level | Cost Range (AUD per m²) | Notes |
| Low | $2,000–2,500 | Basic inclusions |
| Mid | $2,600–3,100 | Standard specification |
| High | $3,200–3,800 | Premium finishes |
The turnkey duplex build cost generally adds 15 to 30% depending on landscaping, fixtures and external works.
Based on a typical duplex dwelling size of 130–170 m².
Example Calculation
150 m² × AUD 2,800 per m² = AUD 420,000 per dwelling
Total cost to build a duplex in Australia = AUD 840,000

Triplex projects usually involve more shared services and additional compliance. Costs below are construction-only.
| Specification Level | Cost Range (AUD per m²) | Notes |
| Low | $2,100–2,600 | Basic inclusions |
| Mid | $2,700–3,200 | Standard specification |
| High | $3,300–3,900 | Premium finishes |
Turnkey pricing also falls within the 15 to 30% uplift.
Typical triplex dwellings fall between 110 and 150 m².
Example Calculation
130 m² × AUD 2,900 per m² = AUD 377,000 per dwelling
Total triplex = AUD 1,131,000
Perth’s market continues to differ from national averages because of regional labour cycles, supply-chain distance and WA-specific engineering requirements. Check out the estimated price ranges for triplex and duplex designs.
Construction-only pricing for Perth dual living homes often trends slightly higher than in some eastern states.
| Specification Level | Cost Range (AUD per m²) | Notes |
| Low | $2,300–2,700 | Basic inclusions |
| Mid | $2,800–3,500 | Standard specification |
| High | $3,600–4,450 | Premium finishes |
Turnkey prices charged by a duplex builder can increase the expenses up to 30%.
Using a common duplex dwelling size of 150 m² and a mid-level rate:
Example Calculation
150 m² × AUD 3,100 per m² = AUD 465,000 per dwelling
Total duplex build price = AUD 930,000
Triplex designs in Perth often require enhanced stormwater, shared service arrangements and additional engineering.
| Specification Level | Cost Range (AUD per m²) | Notes |
| Low | $2,400–2,800 | Basic inclusions |
| Mid | $2,900–3,600 | Standard specification |
| High | $3,700–4,500 | Premium finishes |
Triplex builders Perth may charge 15 to 30% extra for turnkey additions.
The triplex building cost ranges from 120 to 150 m².
Example Calculation
130 m² × AUD 3,200 per m² = AUD 416,000 per dwelling
Total cost to build a triplex = AUD 1,248,000
Here’s an estimated cost breakdown based on different factors:
| Cost Factor | Australia (Duplex) | Australia (Triplex) | Perth (Duplex) |
Perth (Triplex) |
| Materials | $150,000 – $220,000 | $145,000 – $210,000 | $170,000 – $260,000 | $160,000 – $240,000 |
| Labour | $110,000 – $160,000 | $105,000 – $150,000 | $125,000 – $185,000 | $115,000 – $175,000 |
| Siteworks | $25,000 – $45,000 | $22,000 – $40,000 | $28,000 – $50,000 | $26,000 – $48,000 |
| Services (Water, Sewer, Power) | $10,000 – $20,000 | $10,000 – $18,000 | $12,000 – $22,000 | $12,000 – $20,000 |
| Architecture & Engineering | $18,000 – $30,000 | $17,000 – $28,000 | $20,000 – $32,000 | $19,000 – $30,000 |
| Permits & Approvals | $6,000 – $12,000 | $6,000 – $12,000 | $7,000 – $14,000 | $7,000 – $14,000 |
| Contingency | $18,000 – $30,000 | $17,000 – $28,000 | $20,000 – $34,000 | $19,000 – $30,000 |
| Builder Margin | $12,000 – $22,000 | $11,000 – $20,000 | $14,000 – $26,000 | $13,000 – $24,000 |
| TOTAL (Per Dwelling) | $350,000 – $520,000 | $330,000 – $480,000 | $400,000 – $590,000 | $370,000 – $530,000 |
Several changes will influence the design, cost and approval pathways for duplex and triplex projects in 2026. The most significant is the introduction of NCC 2025, expected to apply to new projects starting in 2026.
Government support can significantly influence project feasibility. While incentives differ by state, several national and WA-specific measures are relevant to duplex and triplex developers.
The WA Residential Design Codes, known as the R-Codes, outline the rules for residential development across the state. They determine how much can be built on a site and have a direct impact on the profitability of duplex and triplex projects.
Forecasting cost movements helps set realistic budgets for custom homes. While the market is stabilising, there are still factors that can influence overall project pricing.
A duplex or triplex builder can reduce risk by carefully mapping each stage of the project. The checklist below covers the most important items for duplex and triplex builds.
The year 2026 will be an important one for a duplex and triplex builder, because it blends new building regulations with gradually stabilising construction markets. NCC 2025 requirements and WA’s evolving R-Codes will shape design, pricing and feasibility.
Triplex and duplex developers who plan early, review compliance in detail and budget with care will be well-positioned to navigate the changes ahead. Strong preparation helps unlock the full value of multi-dwelling projects and ensures they remain financially viable in a shifting construction environment.
A standard duplex in Australia generally costs $2,000–$3,800 per m² in 2026. For most designs, total build prices fall between $550,000 and $1.2 million, depending on finishes, location and site conditions.
Triplex builds start from around $770,000 for three basic units, but prices rise quickly with larger floor plans, sloping blocks, and premium materials. Expect higher overall costs compared to duplexes due to extra services and approvals.
Key cost drivers include location, design complexity, materials, site slope, soil quality, and council requirements. Urban areas and premium finishes tend to push costs higher.
No. Duplex and triplex build quotes usually cover construction only. Land purchase, demolition, soil works, permits, and landscaping are separate expenses you must factor into the total budget.
Yes, they can be great investments. They maximise land use, offer multiple rental incomes, and often provide higher long-term returns compared to single homes on the same block.
Basic builds are the most affordable, while mid-range or premium finishes can increase the price by 20–40%. Materials, appliances, façade choices, and custom design upgrades all influence the final cost.
Most duplex or triplex builds take 6–12 months, depending on design, approvals, weather, and material availability. Complex sites or custom designs may take longer.